Roll-Off Dumpsters for Construction Job Sites

Icon Dumpsters provides dependable construction dumpster rental services for contractors, builders, and developers throughout Utah. Our roll-off containers are built to handle heavy debris from demolition, remodeling, roofing, and ground-up construction projects.

Whether you're managing a residential build in Salt Lake County or a commercial renovation in Ogden, we deliver the right dumpster size to keep your job site clean, organized, and on schedule.

Construction Workflows We Support

  • Remodels and tenant improvements: Room-by-room demolition debris, drywall, trim, and flooring removal.
  • Roofing projects: Tear-offs, shingle disposal, and coordinated pickup timing around active crews.
  • Demolition phases: Interior demo and structural cleanup where weight and container access both matter.
  • Multi-phase jobs: Projects that shift from demolition to framing to finish work and need flexible pickup timing.

Construction Materials We Accept

  • Drywall and sheetrock
  • Lumber and wood framing
  • Concrete and masonry debris
  • Roofing shingles and underlayment
  • Metal, steel, and scrap materials
  • Demolition debris
  • General construction and remodeling waste

For concrete, dirt, and other dense debris, review the concrete dumpster rental details before booking.

Dumpster Sizes for Construction Projects

We offer 10, 15, 20, and 30-yard roll-off dumpsters to match the scale of your project:

  • 10 Yard Concrete Dumpster: Best for small cleanouts, yard debris & attic clearing
  • 15 Yard: Ideal for small remodels and light demolition
  • 20 Yard: Most popular for roofing jobs and mid-size renovations
  • 30 Yard: Best for large-scale construction and commercial demolition

Start with volume, then pressure-test weight. Bulky debris may need more cubic capacity, while dense materials can hit weight limits before the bin looks full. The dumpster size guide and pricing page help estimate this before scheduling.

Why Contractors Choose Icon Dumpsters

  • Flexible scheduling to match construction timelines
  • Same-day delivery available in many Utah areas
  • Transparent weight-based billing at $55 per ton
  • No hidden fees or long-term contracts
  • Reliable pickup when your project phase is complete

Active Jobsite Scheduling and Full-Container Planning

On active sites, pickup timing is usually as important as container size. If a dumpster fills early, call as soon as possible so pickup and next-step scheduling can be planned around your crew. Availability depends on route capacity and project location.

If your project has limited placement windows, narrow access, or shared parking constraints, include those details in your quote request. Early placement planning helps avoid delays on delivery day.

Transparent Pricing for Construction Debris

Our pricing is straightforward: a flat delivery fee plus disposal at $55 per ton. You only pay for the actual debris weight — nothing more.

We provide landfill weight receipts for every load, giving contractors clear documentation for budgeting and accounting.

Prohibited or Contaminated Loads

Prohibited materials are not accepted in standard construction loads. Mixed or contaminated loads can create extra handling requirements and additional charges. Review accepted and prohibited materials before loading, especially for paint, chemicals, batteries, refrigerants, and regulated waste.

Construction Dumpster Rental FAQ

How do I choose between a 20 yard and 30 yard container for construction work?

Choose based on both debris volume and debris weight. A 20 yard often fits roofing and mid-size remodel work, while 30 yard is usually better for larger demolition and multi-phase projects.

What if the dumpster fills before my job phase is finished?

Call as soon as the container is nearing capacity so pickup and next-step scheduling can be coordinated with route availability.

Can I load concrete and general construction debris together?

Heavy-material loads can require a different container plan. Review the concrete and heavy-debris guidance first so the right container is scheduled for your material type.

Do street placements for construction dumpsters require permits?

Street placement can require municipal approval depending on the city and right-of-way rules. Verify permit needs before delivery if private placement is not available.

Dumpster Size *
Fast Response
No Obligation
5-Star Rated

Choose the Right Dumpster Rental Size

Compare our 10, 15, 20, and 30 yard dumpster rental sizes. All rentals include delivery and pickup, with disposal billed at $55 per ton.

10

Yard Concrete Dumpster Rental

10 yard concrete dumpster rental dimensions and capacity chart
  • Call for pricing
  • 7-day rental, 2 tons included, $55 per extra ton
  • 15' x 8' x 2'
  • Holds 10 cubic yards
  • Ideal for small cleanouts, yard debris & attic clearing
Get a 10 Yard Concrete Dumpster Quote
15

Yard Dumpster Rental

15 yard dumpster rental dimensions and capacity chart
  • Starting at $325
  • 7-day rental, 2 tons included, $55 per extra ton
  • 10' x 7' 11" x 4' 7"
  • Holds 15 cubic yards
  • Great for garage cleanouts & small remodeling projects
Get a 15 Yard Dumpster Quote
POPULAR
20

Yard Dumpster Rental

20 yard dumpster rental dimensions and capacity chart
  • Starting at $375
  • 7-day rental, 2 tons included, $55 per extra ton
  • 21' 11" x 7' x 3' 6"
  • Holds 20 cubic yards
  • Perfect for home renovations & mid-size construction projects
Get a 20 Yard Dumpster Quote
30

Yard Dumpster Rental

30 yard dumpster rental dimensions and capacity chart
  • Starting at $400
  • 7-day rental, 2 tons included, $55 per extra ton
  • 21' 11" x 7' x 5' 2"
  • Holds 30 cubic yards
  • Ideal for large construction jobs, demolition, & full home cleanouts
Get a 30 Yard Dumpster Quote

Need a Dumpster Rental in the Wasatch Front?

Fast dumpster delivery throughout the Wasatch Front with transparent pricing and same-day availability in most areas.